Projects

BIO SONIC

TECH Industrial Services helped design, develop, and build prototypes and the final product for Bio Sonic to detect and monitor underwater threats that could enter our Naval or Strategic Ports. See more images…

BOEING

TECH Industrial Services advised, collaborated and built material handling equipment to load a complete galley in the fuselage of a 737. See more images…

WELLS DAM / DOUGLAS COUNTY PUD

TECH Industrial Services coated all major water passage parts including the Runner Hub, Intermediate Head Cover, 20 Wicket Gates and the Draft tube Liner. See more images…

OGLETHORPE POWER COMPANY

TECH Industrial Services repaired 20 damaged Stay Vanes with the TECH-Plate coating system at the Rocky Mountain Hydro Plant in Rome, GA. TECH Industrial Services was able to mobilize and complete the scope of work on site in 2 1/2 weeks to meet the customers tight outage time frame. See more images…

HAWI RENEWABLE DEVELOPMENT

TECH Industrial Services was contracted to repair (24) 2500 KVA Transformers in Hawi, HI. Due to the harsh humidity and salt spray environment the existing transformers had corrosion issues with the oil tanks and radiators. TECH Industrial replaced the existing steel radiators with new Stainless Steel radiators. The retrofitted transformers were then coated with the TECH-Plate coating system. See more images…

OGLETHORPE POWER COMPANY PHASE 2

TECH Industrial Services was awarded a second unit at Oglethorpe Power Company’s Rocky Mountain Hydro Plant. Work entailed repairing Cavitation damage and coating entire Stay Vane with the TECH-Plate coating System. See more images…

TOSHIBA INTERNATIONAL CORP.

TECH Industrial Services coordinated, and built a 15,000 lb heavy haul cradle system to handle a 65 Ton Rotor Shaft for Wells Dam. TECH Industrial was able to deliver this project on site on a tight five day turn around. See more images…

TOSHIBA FLOATING PLATFORM

TECH Industrial Services Fabricated a suspended work platform for Toshiba International Corp. Wells Dam project.
The platform was built in a 10 day period to work inside with Toshiba’s tight Outage schedule. The Platform was delivered onsite and then load tested with 28,000 Lbs of water. See more images…

OGLETHORPE POWER COMPANY PHASE 3

TECH Industrial Services repaired Cavitation damage on the draft tube liner just below the discharge ring on all three units at Oglethorpe’s Rocky Mountain Hydro Facilities. In addition Unit #2 stay vanes and the balance of Unit #3 Stay Vanes were coated with the TECH-Plate coating system. See more images…